Basic and Detail Design OSS Jacket Baltic Sea

KCI performed the concept and basic design (2nd BSH) for a Jacket foundation of an Offshore Substation in the Baltic Sea in 2013.

Various concepts were investigated ranging from a jacket with 4 to 8 legs, and post- and pre-piled options were studied. The final concept consisted of 6 legs and is a pre-piled jacket, which was the starting point for the basic design.

 

 

In 2014 KCI started the Detail Design (3rd BSH) for the same OSS jacket.